Project |
Priority |
Comments |
21. Splash by
May 1st |
1 |
March 12 - T
minus 56 days until launch and counting.
May 5 Splash is scheduled. The boat is ready for a May 1 splash.
Accomplished |
1. Replace the
10 gallon waste bag with a 22 gallon hard tank , and all sanitary hose, vent
filter and
fittings |
2 |
Done |
23. Install
Windlass |
3 |
Installing
Bow-roller/sprit instead, windlass maybe next year |
4. Install
Cabinet fronts port and starboard |
4 |
Have lumber |
5. Re-cover
cabin cushions |
5 |
in progress,
Linthicum Sail Makers.
Done. |
7. epoxy fill
base of compression post |
6 |
|
8. Move 2 27 G
batteries to location over shower sump |
7 |
Batteries moved
from cabinet, wiring removed, transferring to battery compartment near
engine. 4 house batteries and 1 crank battery bought. See
Electrical upgrade page.
Done. Also bought 3 new LED internal lights at
the defender.com sale. |
26. Repair
screens |
8 |
In Progress |
9. Refinish
cabin teak (table, bulk heads, knees, cabinets, drawers, table, etc...) |
8 |
In Progress.
Done. |
18. Lots of
cleaning |
9 |
In Progress,
Done. |
15. Install New
VHF, Chart platter, stereo |
10 |
Bought a
Raymarine e7, Standard Horizon GX1700, stereo on hold.
Done. |
17. Misc wiring |
10 |
In Progress,
Done. |
19. Bottom
paint |
10 |
Bottom paint
purchased (Petit)Done |
10. Reinstall
hanging cabinet over counter/sink with small microwave |
11 |
Microwave going
next to stove, Under counter TV/DVD going where old Dish Cabinet location
used to be |
12. Remove
gelcoat oxidation (Poliglow stripper) |
12 |
Poliglow on
hand, waiting for weather
Done |
13. Kiwi grip
non skid |
12 |
Paint on hand,
waiting for weather |
14. Poliglow
Hull and smooth surfaces on deck |
12 |
Polyglow on
hand, waiting for weatherDone |
20. Bowsprit
for Anchor |
13 |
New Anchor and
roller mated, now waiting for weather break to mount sprit |
3. Replace
faucets in head and galley |
14 |
Bought new
faucets, will install eventually.
Done. |
11. Refinish
(strip and oil) deck grab rail and combing step teak |
15 |
In Progress -
Stripped |
25.
Companionway Hatch door |
16 |
|
2. Move water
pump to bulkhead |
20 |
Done,
moved under lazarette floor |
6. Refinish
cabin sole |
20 |
Bilge boards
Done.t
The wind lull will dictate when the rest is done. |
22. Rub Rail
Install |
21 |
maybe not |
16. Keel fin
extension aft (may wait until next year on this) |
25 |
maybe not |
24. New
Traveler blocks |
26 |
Done,
need two fairleads on combing |
27. New
Primary Jib Sheet Winches |
28 |
next year, have
new 1/2" jib sheet line and winchers for this year |